The art of communication since 2012

Bringing heritage up to modern comfort
Bringing heritage up to modern comfort
We visited
Jan-Felix Nédée at Priorij Corsendonk to admire its renovated Guest House and
Lay House. This time, we talked about the engineering work involved, such as the
sustainable technologies you don’t immediately see, but can certainly feel.
Impressive work by Vörtgang by Studibo, and we had the pleasure of writing a
case study about it.
A monastery complex dating back to 1395, a family business in its third generation, and 23 rooms that bring history and comfort together. Priorij Corsendonk in Oud-Turnhout has undergone a major renovation of its Lay House and Guest House, with Vörtgang by Studibo leading the HVAC and plumbing works. The result: a protected heritage building ready for the future, without compromising on luxury or character.
Building within protected walls
Priorij Corsendonk has been in the welcoming hands of the Nédée family for decades. Grandfather Fernand bought the estate in 1968 and breathed new life into the complex by opening its very first hotel rooms. There have been several renovations since, but this time Corsendonk Hotels took things a step further.
Jan-Felix Nédée, now CEO and the third generation at the helm, explains why: “Neither of the two existing buildings had air conditioning. That’s no small thing when it comes to modern comfort. Summers are getting warmer, so the indoor climate needs to adapt. In the first phase, the Lay House and Guest House were transformed, creating a total of 23 rooms where historic character, luxury and a contemporary experience come together. And there’s more to come later.”
Working in a listed building comes with its own challenges. Space is fixed, and structural changes are rarely possible. “We’re working in listed buildings, with all the restrictions that entails,” says Nédée. “The solution lay in thorough preparation. The architectural and technical teams coordinated closely in advance, using 3D simulations to ensure that all the technical installations would fit neatly within the existing structure. Any issues on site were resolved straight away. Everything fits.”
Comfort without compromising heritage
For the rooms’ technical systems, Priorij Corsendonk chose a combination of proven and forward-looking technologies:
- Air-to-water heat pumps running on propane provide heating and cooling without fossil fuels.
- Type D ventilation with heat recovery ensures a healthy indoor climate, even in protected buildings where ventilation modifications are limited.
- KNX zone control operates fan coil units for heating, cooling and ventilation—room by room, zone by zone.
- Rainwater recovery helps reduce water consumption.
- The sanitary installations are tailored to each room, with consumption monitored throughout.
Managing consumption: the hotel system at the heart of it
An important consideration in the renovation was managing energy use efficiently in each room. “We had made it clear from the outset that we wanted to work with a hotel system,” Nédée continues. “It’s important to know exactly when a room is occupied and when a guest actually enters. In the past, this was done with a traditional key card and card reader. Today, we use sensors, occupancy detection and magnetic contacts. As soon as a guest opens the door and enters the room, our software registers that the room is booked and the guest is present. That allows us to regulate the temperature automatically.”
Proud of the result
This was the first time Priorij Corsendonk and Corsendonk Hotels had worked with Vörtgang by Studibo. Nédée sums it up: “It all went incredibly smoothly. Managing Partner Tom Smets immediately understood what we were aiming for. He came up with great ideas, and we were able to leave the details in their hands. Vörtgang is part of the wider Studibo family of engineering and certification firms, and you can tell. The team can draw on the expertise of the other labels. Together, they can offer clients even more advice—that’s a real added value.”
“The collaboration felt successful and fruitful. Building an HVAC installation is always a major investment – you simply want it to work well. We had plenty of hot days this summer, and the installation has already proved its worth. It’s effective.”
The renovated rooms were completed in the summer of 2026 – a milestone for Corsendonk Hotels and the start of a new chapter for Priorij Corsendonk. From now on, historic character, modern comfort and sustainable technology go hand in hand.





